GKN Birmingham

Lockers and Special Seating Project Lockers and Canteen Equipment for GKN Birmingham

Workplace Products were asked to supply over 200 lockers for GKN in Birmingham.

The concept was to refurbish the locker area provide cloakroom seating and canteen tables . The lockers needed to be a robust design with sloping tops, and offer an attractive style to enhance the area.
After meeting between the management of GKN and Peter Hargreaves, Sales Director of Workplace Products ,
a scheme was devised that met the requirements. Important to GKN was delivery,
the project had to be completed just after Christmas, whilst the company was on shutdown, this was achieved.
Also important was that further lockers could be added later that matched in both design and colour,
together with a robust supply of spares parts i.e. keys/ locks etc.

Please Click Here for more Projects

Last update: Aug. 13, 2010

 
Powered by Olark