Product Categories
- Access Platforms
- Access Ramps / Trench Covers
- Archive Storage
- Barrel Pumps and Barrel Taps
- Barriers and Bollards
- Benches
- Bins / Litter Pickers
- Canteen Furniture
- Castors
- Cloakroom Equipment
- Clocks, Watches and Timers
- Cones
- Containers
- Conveyor Systems
- Cranes
- Cycle Shelters / Racks
- Cylinder Storage
- Dock Plates and Dock Boards
- Drum and IBC Storage
- Fans / Air Conditioning
- Fire Equipment
- First Aid Kits and Equipment
- Flammable Liquids Handling
- Floor / Road Marking
- Forklift Truck Attachments
- Heaters
- Hi-Vis Clothing
- Identification and Aisle Marking
- Janitorial - Microfibre Systems
- Janitorial Equipment
- Ladders
- Lifters and Stackers
- Lifting Equipment
- Lighting
- Lockers
- Louvre Panels
- Mailroom Equipment
- Marking Equipment
- Matting
- Measuring and Monitoring
- Mesh Enclosures
- Mirrors
- Notice Boards
- Office Equipment
- Packaging Equipment
- Paint - Paint Removal
- Pallet Trucks
- Pallets
- Partitioning
- Personal Protection Equipment
- Plan Chests
- Post Boxes
- Pressure Washers
- Racking
- Safety and Security Mirrors
- Salt Spreaders
- Scales
- Scissor Lift Tables
- Security Cages
- Security Products
- Shelving
- Signs / Labels
- Skips
- Smoking Shelters
- Speed Ramps / Kerb Ramps
- Spillage Response Equipment
- Stainless Steel Products
- Steps
- Storage and Security Cages
- Storage Containers
- Storage Cupboards
- Strip Curtains and Welding Screens
- Telephone Hoods
- Time Attendance Equipment
- Trucks and Trolleys
- Vacuum Cleaners
- Vices
- Walkways
- Washroom Equipment
- Winter Products
- Workbenches
- Workstations
Four Dwellings Cycling Initiative
Cycling Initiative – Cycle Shelter Project
As part of the governments cycling initiative Four Dwellings School were given extra funding to provide a safe and secure cycle shelter for its pupils.
Having investigated various options and various manufacturers Four Dwellings decided on
Workplace Products to provide a supply deliver and install package.
The design of the shelter allowing for an initial shelter plus extensions provided the cycle shelter capacity they required at the target price (please see pic below).
The installation was carried out during the summer recess to ensure minimum disruption to the school day.

Please Click Here for more Projects
Last update: Aug. 13, 2010
Your basket is currently empty.
Information
Order Online Using The Following Cards:

Or Use Your Account






